The aerial tour shows the new realignment of the Laguna Seca landing approach on both the eastside and westside of the proposed bridge, adjacent to the existing ferry landing at LONG 18o18'49.33" N - LAT 88o19'49.76W.
Here is a short video snippet of ongoing work at our Laguna Seca Ferry/bridge. Our sources have informed us that the Laguna Seca Ferry should be replaced by the end of December 2022.
Ferry Laguna Seca The ferry connects Cooper Bank with Chunox and is a great help, soon it will disappear, a bridge to Sarteneja is being built and will be finished this year 2023 and will remain in history.